水电站预应力闸墩设计分析(英文版)
资料介绍
水电站预应力闸墩设计分析(英文版)
出版时间:2010年版
内容简介
本书系统介绍了巴贡水电站溢洪道预应力闸墩的三维有限元分析结果,详细描述了中墩和边墩关键部位的应力和变形情况,分析了锚固区应力受预应力施加方式的影响,比较研究了竖井和锚拉洞两种锚固方案。本书可用作水利行业涉外工程设计人员的参考书,也可供水利水电专业在校学生学习相关专业知识。
目录
Forewords
Introduction
1.1 General of the project
1.2 Layout of weirs
1.3 Layout of piers
1.4 Design of tainter gate support
1.5 Arrangement of prestressed tendons
Basic parameters and design priciples
2.1 Basic parameters
2.1.1 Characteristic water levels
2.1.2 Water surface profile on the pier
2.1.3 Unit weight of water
2.1.4 Properties of rock foundation
2.1.5 Properties of concrete
2.1.6 Properties of tendons
2.1.7 The thrust of tainter gate
2.1.8 Tonnage of the prestressed tendons
2.1.9 Earthquake parameters
2.1.10 Temperature load
2.1.11 Thrust of the bulkhead gate
2.2 Limit states of concrete
2.3 Loads and load combinations
2.3.1 On the middle pier
2.3.2 On the side pier
Numerical model of the pier
3.1 Assumptions
3.2 Region of finite element analysis
3.3 Boundary conditions
3.4 Model of the pier
3.4.1 Coordinate system
3.1.2 The FEM model
3.5 Analysis procedures
4 Results of the middle pier
4.1 Definitions
4.1.1 Coordinate systems
4.1.2 Stress
4.1.3 Displacement and deformation
4.1.4 Characteristic sections
4.1.5 Key points
4.1.6 The paths
4.1.7 Terminology
4.2 Results of the stresses
4.2.1 Anchorage block
4.2.2 Bearing area of the pier
4.2.3 The upstream vertical anchorage well
4.2.4 The intersecting line of pier body with base plate
4.2.5 The slot of the tainter gate
4.2.6 Bulkhead slot
4.2.7 The galleries
4.3 Results of the displacements
4.3.1 Anchorage block
4.3.2 Bearing area of the pier
4.3.3 The upstream vertical anchorage well
4.3.4 The intersecting line of pier with base plate
4.3.5 The tainter gate slot
4.3.6 The bulkhead slot
4.3.7 The galleries
4.3.8 Contour map of the displacements
5 Results of the side pier
5.1 Definitions
5.1.1 Coordinate systems
5.1.2 Stress
5.1.3 Displacement
5.1.4 Characteristic sections
5.1.5 Key points
5.1.6 The path
5.1.7 Terminology
5.2 The results of stresses
5.2.1 Anchorage block
5.2.2 Bearing area of the pier
5.2.3 The upstream vertical anchorage well
5.2.4 The intersecting line of pier with base plate
5.2.5 The slot of the tainter gate
5.2.6 Bulkhead slot
5.3 Results of the displacements
5.3.1 Anchorage block
5.3.2 Bearing area of the side pier
5.3.3 The upstream vertical anchorage well
5.3.4 The intersecting line of side pier with base plate
5.3.5 The tainter gate slot
5.3.6 The bulkhead slot
5.3.7 Contour maps of the displacements
Conclusions
6.1 The middle pier
6.1.1 The stresses of main parts
6.1.2 The displacements of main parts
6.2 The side pier
6.2.1 The stresses of main parts
6.2.2 The displacements of main parts
6.3 Suggestions
Appendix-A Anchor-plans comparison of vertical anchorage well with anchorage cavities.
Appendix-B Stress of the anchorage region of prestressed tendons
Appendix-C Stress band plot in the unfavorable load cases
Appendix-D Constant value line figures of stresses
References
出版时间:2010年版
内容简介
本书系统介绍了巴贡水电站溢洪道预应力闸墩的三维有限元分析结果,详细描述了中墩和边墩关键部位的应力和变形情况,分析了锚固区应力受预应力施加方式的影响,比较研究了竖井和锚拉洞两种锚固方案。本书可用作水利行业涉外工程设计人员的参考书,也可供水利水电专业在校学生学习相关专业知识。
目录
Forewords
Introduction
1.1 General of the project
1.2 Layout of weirs
1.3 Layout of piers
1.4 Design of tainter gate support
1.5 Arrangement of prestressed tendons
Basic parameters and design priciples
2.1 Basic parameters
2.1.1 Characteristic water levels
2.1.2 Water surface profile on the pier
2.1.3 Unit weight of water
2.1.4 Properties of rock foundation
2.1.5 Properties of concrete
2.1.6 Properties of tendons
2.1.7 The thrust of tainter gate
2.1.8 Tonnage of the prestressed tendons
2.1.9 Earthquake parameters
2.1.10 Temperature load
2.1.11 Thrust of the bulkhead gate
2.2 Limit states of concrete
2.3 Loads and load combinations
2.3.1 On the middle pier
2.3.2 On the side pier
Numerical model of the pier
3.1 Assumptions
3.2 Region of finite element analysis
3.3 Boundary conditions
3.4 Model of the pier
3.4.1 Coordinate system
3.1.2 The FEM model
3.5 Analysis procedures
4 Results of the middle pier
4.1 Definitions
4.1.1 Coordinate systems
4.1.2 Stress
4.1.3 Displacement and deformation
4.1.4 Characteristic sections
4.1.5 Key points
4.1.6 The paths
4.1.7 Terminology
4.2 Results of the stresses
4.2.1 Anchorage block
4.2.2 Bearing area of the pier
4.2.3 The upstream vertical anchorage well
4.2.4 The intersecting line of pier body with base plate
4.2.5 The slot of the tainter gate
4.2.6 Bulkhead slot
4.2.7 The galleries
4.3 Results of the displacements
4.3.1 Anchorage block
4.3.2 Bearing area of the pier
4.3.3 The upstream vertical anchorage well
4.3.4 The intersecting line of pier with base plate
4.3.5 The tainter gate slot
4.3.6 The bulkhead slot
4.3.7 The galleries
4.3.8 Contour map of the displacements
5 Results of the side pier
5.1 Definitions
5.1.1 Coordinate systems
5.1.2 Stress
5.1.3 Displacement
5.1.4 Characteristic sections
5.1.5 Key points
5.1.6 The path
5.1.7 Terminology
5.2 The results of stresses
5.2.1 Anchorage block
5.2.2 Bearing area of the pier
5.2.3 The upstream vertical anchorage well
5.2.4 The intersecting line of pier with base plate
5.2.5 The slot of the tainter gate
5.2.6 Bulkhead slot
5.3 Results of the displacements
5.3.1 Anchorage block
5.3.2 Bearing area of the side pier
5.3.3 The upstream vertical anchorage well
5.3.4 The intersecting line of side pier with base plate
5.3.5 The tainter gate slot
5.3.6 The bulkhead slot
5.3.7 Contour maps of the displacements
Conclusions
6.1 The middle pier
6.1.1 The stresses of main parts
6.1.2 The displacements of main parts
6.2 The side pier
6.2.1 The stresses of main parts
6.2.2 The displacements of main parts
6.3 Suggestions
Appendix-A Anchor-plans comparison of vertical anchorage well with anchorage cavities.
Appendix-B Stress of the anchorage region of prestressed tendons
Appendix-C Stress band plot in the unfavorable load cases
Appendix-D Constant value line figures of stresses
References
相关资料
- 浠水文化 1978 浠水县文化馆编
- 水利电力部标准汇编 热力工程 1 设计 水利电力部编 1991年版
- 宁夏水利工程格宾与塑料土工格栅应用技术导则 宁夏回族自治区水利厅,宁夏水利科学研究院编 2018年版
- 太湖贡湖湾水源地蓝藻水华污染研究 唐承佳 著 2020年版
- 太湖流域重大治污工程水生态影响监测与评估 吴时强等著 2019年版
- 太湖流域春申君治水传说研究 (日)中村贵 著 2020年版
- 太湖志 水利部太湖流域管理局,《太湖志》编纂委员会编 2018年版
- 天水市水利志 (远古-2010年) 天水市水利市编纂委员会编 2015年版
- 在水一方 话说水生态文明 福建省水利厅,福建省水利水电勘测设计研究院编 2018年版
- 水利水电工程施工技术全书 第二卷 土石方工程 第七册 土石坝沥青混凝土防渗体施工技术 汤用泉,张小华等 2018年版